10,000 CY of roadway excavation, installation of 100 LF two lane, temporary bridge over the existing, failing bridge; temporary reinforced earth retaining wall (3,000 LF); maintenance of the Six Mile Run stream by pipe diversion; 20 LF span precast arch culvert (60 LF), precast T-Wall retaining wall (4,659 SF) and miscellaneous site work and restoration.