Construction of the Green Brook Flood Control Segment U Project included earthwork, 2,700 LF Earth Levee, 500 LF concrete wall on sheet piles, 400 LF sheet pile retaining wall w/ concrete cap, drainage structures and pipe, minor paving and miscellaneous site improvements and restoration.